Every year, two obligations land in the same spot on the calendar and get in each other's way: annual reviews and the training plan. One occupies managers for six weeks, the other pulls employees out of production for several days. In most companies, both are treated as administrative chores, planned in a rush, and produce exactly what you'd expect from a chore: slots people are forced into, a string of postponements, and a training budget partly wasted.
That's not inevitable. These two projects share a trait that makes them easy to optimise: they're known a year in advance. Nothing forces you to improvise them.
What a poorly planned training session really costs
The advertised cost of a training session is the price of the course. The real cost is made up of four lines, and the first is the smallest.
Take a two-day training session at €900 for six people. The course fee comes to €5,400. Add twelve lost production days, roughly €4,200 in fully loaded wages. Then, if there's travel involved, between €1,500 and €3,000 in transport and accommodation. Finally, the invisible cost: catching up. Someone returning after two days away spends half a day clearing the backlog, sometimes more if their role wasn't covered.
Real total: between €12,000 and €14,000 for an advertised invoice of €5,400. Executives who negotiate hard on the course price often overlook the remaining 60%, which depends almost entirely on planning.
Three decisions bring this total down, and none of them touches the quality of the training:
The date. Training scheduled during a busy period costs twice as much, because it generates overtime for those who stay and catch-up time for those who leave. The same training scheduled during a lull costs almost only its course fee.
Grouping. Six people trained on the same day is an in-house session, often cheaper per person than an open-enrolment course, with no travel involved. But six people absent on the same day is also a service to cover. The balance is often found in two sessions of three, a week apart, if and only if the trainer agrees to come back.
Splitting. Two consecutive days pull someone out of production for two days. Four half-days spread over a month cost more in catch-up time but often avoid ever disrupting a full working day, and retention of the material is better. The right split depends on the job: ask, don't assume.
The training plan: start with constraints, not the catalogue
The usual sequence is to pick the courses first, then look for dates, then discover nobody's available. The effective sequence does the opposite.
First establish, for the year, the windows where production can absorb an absence: slow periods, weeks without a closing, times outside school holidays. In many companies, these windows amount to fifteen to twenty weeks a year. The entire training plan has to fit inside them, and it's this constraint that should be communicated to training providers, not the other way around.
Then gather, from each employee, four pieces of information:
- The skills they want to develop, distinguished from the ones their role requires. The two lists only partly overlap, and the gap is the raw material for a useful review.
- Their impossible periods: childcare, recurring personal constraints, client commitments already made.
- Their preferred format: grouped in-person, spread-out remote, guided self-study. An imposed format is the leading cause of training that's attended but never absorbed.
- Who can cover their day-to-day tasks while they're away. A question rarely asked, and one that on its own resolves half of all postponements.
These answers, given separately, without each person seeing what others said, look nothing like answers given in a team meeting. Nobody announces in front of colleagues that they need training on a tool they're supposed to already master.
OuiCanPlan is built for this collection step: you describe the campaign in a few lines, everyone answers via a link in two minutes, confidentially, and you get back the groupings and time slots that are genuinely compatible with production needs and everyone's constraints, along with a breakdown of what's blocking things. The results are real, with no advertising.
Annual reviews: the real problem isn't the date
A review campaign is typically eight people per manager, one hour each, spread over six weeks. On paper, it's trivial. In practice, a third of reviews get postponed at least once, and the last ones happen in February in a rushed, checked-out mood.
Three causes come up again and again.
The slot is imposed by the manager's calendar. The employee receives an invitation, puts up with it, and shows up without having prepared. An annual review unprepared on both sides is an hour wasted for two people — roughly €90 thrown away, multiplied by headcount.
No preparation time is scheduled. Asking for a self-assessment the night before guarantees a box-ticking answer. Budget one hour of preparation for the employee, one for the manager, and put it in the calendar like anything else.
The location isn't neutral. A review held in the manager's office, door ajar, with the open-plan floor watching, will never produce the conversation it's supposed to. Book a closed room, and if the team is remote, a one-on-one video call beats a hallway chat.
The right method fits in one sentence: offer three time slots, let people choose, and block the preparation time in both calendars. An employee who chose their own slot rarely cancels it.
Two additional rules avoid most of the damage. Never schedule reviews the same week as a closing or a launch: nobody's head is in it, on either side. And never exceed three reviews a day for the same manager; by the fourth, it stops being about listening and becomes about going through the motions.
The topic everyone avoids: workload
A well-run annual review necessarily addresses workload. Yet it's the point that gets skipped most often, because it's uncomfortable for both sides: the employee is afraid of looking incapable, the manager doesn't always have a solution.
Three precise questions work better than a vague "how are things going?":
- How many times this quarter did you work beyond your hours, and on what?
- What tasks are part of your daily work without being in your job description?
- What would you stop doing tomorrow if you were allowed to?
The third is by far the most productive. The answers almost always reveal reporting that's become useless, a meeting inherited from a finished project, or a redundant approval step. Out of ten reviews, this typically uncovers two to five things that can be dropped immediately — that's time given back to production, without hiring anyone.
Merging the two campaigns instead of enduring them separately
The annual review is the only time of year when someone's skills are actually discussed. The training plan is the only annual decision about those skills. Treating them separately, three months apart, with two different forms, is a common organisational absurdity.
The calendar that works fits into four stages:
- Week 1: confidential collection of constraints, training wishes and availability, from everyone at once.
- Weeks 2 to 5: reviews, with the wish list already on the table. The conversation starts from a concrete document instead of a blank page.
- Week 6: consolidation. Needs naturally cluster together — five people want the same advanced spreadsheet training, three want the same certification.
- Week 7: a dated training plan, placed inside the identified production windows, announced to everyone with firm dates.
A campaign run this way takes less time than running the two separately, and it produces a training plan that employees recognise as their own — which radically changes actual attendance rates.
What to track to know whether it worked
The training budget spent isn't a useful indicator: it measures the expense, not the effect. Four numbers can be tracked without building a whole reporting system:
- The postponement rate, training by training and review by review. Above 20%, the problem is planning, not motivation.
- The time between the request and its fulfilment. Training requested in January and delivered in November has lost much of its usefulness, and the employee has learned that their request didn't matter.
- The gap between the announced plan and the plan actually delivered. This is management's credibility indicator; it deteriorates fast and repairs slowly.
- A single question asked three months later: "what have you actually applied from this training?" Blank answers point to the wrong format or timing, rarely a bad trainer.
In summary
Reviews and training are two predictable projects, and therefore optimisable ones. Most of their cost has nothing to do with the provider's price and everything to do with the chosen date, how participants are grouped, and the quality of preparation.
Half a day of planning at the start of the year, a confidential two-minute survey per employee, and two merged campaigns instead of two separate chores: that's what separates a training budget that's merely spent from one that's actually useful — and an annual review people endure from a conversation both sides walk away from with something to show for it.